Chris Craft Continental
What was done:
• Changed keel plank
• 70% of floors
• New bottom (3 layer plywood)
• Re-planking (some planks was changed with new, originals was restored)
• Transom repair (new construction and planks)
• Deck repair works (new stripes)
• Full hull varnishing
• New copper antifouling